Overview
Project ID: | IP - VINH PHUC | ||||||
Status |
Ready | ||||||
Price for sales: | 060 | ||||||
Available of Land: | 1,310,000 m² | ||||||
Land of Complex: |
|
||||||
Minimum of Land size: | 10,000 m² | ||||||
Leasable area: |
|
||||||
Developer: | FLC Group Joint Stock Company | ||||||
Period: | - |
Our consultant

Land and RBF of Price and service
Land: |
60.00 USD/m² |
Factory: |
4.00 USD/m² |
Industrial : | Mechanical engineering Precision equipment, steel structure, motor fabrication, mold manufacturing for metal and non-metal products Lifting equipment |
Service support
(Prepare Documents and Submit)IRC, ERC application support | |
Prepare Document and Submit |
Location
Center of HN City | 50km |
Located next to Highway 2A | |
Noi Bai airport | 35 km |
Adjacent to the Hanoi - Lao Cai railway line | |
Cai Lan deep-water seaport | 170km |
Description
- Rush hour: 0.1 USD
- Normal: 0.05 USD
- Off-peak hours: 0.03 USD
- Payment method: Monthly
- Supplier: EVN
- Water price: 0.4 USD/m3
- Payment method: Monthly
- Water provider: Charged by Gov. suppliers
- Price: 0.28 USD/m3
- Payment method: Monthly
- Water quality before treatment: Level B
- Water quality after treatment: Level A
- The main road is 31m wide with a number of lanes is 4 lanes
- The secondary road 15m wide with a number of lanes is 2 lanes
Advantage and Disadvandtage
Advantage: |
|
Disadvantage |
-
|
Overview
Project ID: | IP - VINH PHUC | ||||||
Status |
Ready | ||||||
Price for sales: | 060 | ||||||
Available of Land: | 1,310,000 m² | ||||||
Land of Complex: |
|
||||||
Minimum of Land size: | 10,000 m² | ||||||
Leasable area: |
|
||||||
Developer: | FLC Group Joint Stock Company | ||||||
Period: | - |
Our consultant
