Overview
Project ID: | HAPH002 | ||||
Status |
Ready | ||||
Price for sales: | 80 | ||||
Available of Land: | 9,303,770 m² | ||||
Land of Complex: |
|
||||
Minimum of Land size: | 10,000 m² | ||||
Leasable area: |
|
||||
Developer: | SAO DO INVESTMENT GROUP JOINT STOCK COMPANY | ||||
Period: | 2009-2059 |
Our consultant

Land and RBF of Price and service
Land: |
80.00 USD/m² |
Factory: |
4.00 USD/m² |
Industries: | Exact mechanics; New materials, specialized materials and construction materials; Electronics, refrigeration, telecommunications, information technology and high technology; Rubber and cosmetics; Petrochemical products; Construction and operation of oil and gas pipelines and LPG storage facilities; Manufacture of packaging and plastic products; Logistics and logistics; Supporting industrial products for high-tech industry; Light industry. |
Service support
(Prepare Documents and Submit)IRC, ERC application support | |
Prepare Document and Submit |
Location
Center of HN City | 120km |
Travelling time from HN center | 110 minutes |
Noi Bai International Airport | 140km |
Hai Phong Seaport | 15km |
Cat Bi International Airport | 16km |
Description
Management fee
- Price: 0.5 USD/m²/year
Electric fee:
- Rush hour: 0.13 USD (2871 VND/Kwh)
- Normal: 0.07 USD (1555 VND/Kwh)
- Off-peak hours: 0.04 USD (1007 VND/Kwh)
- Electricity High-voltage power station: 35kV & 22kV
Clean water supply fee:
- Price: 0.72 USD/m3 (16300 VND/m3)
- Capacity: 30,000 m3/day.
Wastewater treatment fee:
- Price: 0.4 – 1.05 USD/m3 (9000 -24000 VND/m3)
- Capacity: 20,000/ m3/day
Road
- Main road: Width: 36m – 46m
- Side branch road: Width: 23m – 34m
Advantage and Disadvandtage
Advantage: |
Having a geographical position and transportation by road, sea, waterway, railway, and air is very convenient for the circulation and transportation of goods. |
Disadvantage |
-
|
Overview
Project ID: | HAPH002 | ||||
Status |
Ready | ||||
Price for sales: | 80 | ||||
Available of Land: | 9,303,770 m² | ||||
Land of Complex: |
|
||||
Minimum of Land size: | 10,000 m² | ||||
Leasable area: |
|
||||
Developer: | SAO DO INVESTMENT GROUP JOINT STOCK COMPANY | ||||
Period: | 2009-2059 |
Our consultant
