Overview
Project ID: | VIPH005 | ||||||
Status |
Ready | ||||||
Price for sales: | 050 | ||||||
Available of Land: | 529,040 m² | ||||||
Land of Complex: |
|
||||||
Minimum of Land size: | 10,000 m² | ||||||
Leasable area: |
|
||||||
Developer: | An Thinh Vinh Phuc Construction Investment Co., Ltd | ||||||
Period: | 2009-2059 |
Our consultant

Land and RBF of Price and service
Land: |
50.00 USD/m² |
Negotiation: | 50-70 USD/m2 |
Factory: |
4.00 USD/m² |
Industrial: | Production of machinery and equipment, transportation services Repair and build new containers Mechanical engineering, electrical equipment Manufacture of metal or non-metallic molds Producing large-sized lifting equipment, manufacturing metalworking machine tools |
Service support
(Prepare Documents and Submit)IRC, ERC application support | |
Prepare Document and Submit |
Location
Center of HN City | 38km |
Located next to Noi Bai - Lao Cai highway | |
Noi Bai International Airport | 17km |
Cai Lan Seaport (Quang Ninh) | 161km |
Located close to the Hanoi - Lao Cai - Kunming railway line (China) | |
Huong Canh Station | 1km |
Viet Tri seaport | 30km |
Description
- Rush hour: 0.1 USD
- Normal: 0.05 USD
- Off-peak hours: 0.03 USD
- Payment method: Monthly
- Supplier: EVN
- Water price: 0.4 USD/m3
- Payment method: Monthly
- Water provider: Charged by Gov. suppliers
- Price: 0.28 USD/m3
- Payment method: Monthly
- Water quality before treatment: Level B
- Water quality after treatment: Level A
- The main road is 31m wide with a number of lanes is 4 lanes
- The secondary road 15m wide with a number of lanes is 2 lanes
Advantage and Disadvandtage
Advantage: |
|
Disadvantage |
-
|
Overview
Project ID: | VIPH005 | ||||||
Status |
Ready | ||||||
Price for sales: | 050 | ||||||
Available of Land: | 529,040 m² | ||||||
Land of Complex: |
|
||||||
Minimum of Land size: | 10,000 m² | ||||||
Leasable area: |
|
||||||
Developer: | An Thinh Vinh Phuc Construction Investment Co., Ltd | ||||||
Period: | 2009-2059 |
Our consultant
